Archive for May, 2013

Late May layout update!

Thursday, May 30th, 2013
Completed yard tracks.

Completed yard tracks.

It’s been a while since the last layout update. If you have been following along, you know the layout wiring is complete. All of the track has been painted and the fascia has been installed. The Wheeling Freight Terminal is looking pretty good.

 

(more…)

Track Installation Basics, part 5

Thursday, May 16th, 2013
Mind the gap!

Mind the gap!

Building a model railroad involves assembling track components into a design that meets a desire to operate or follow a prototype location. In many cases, three-foot sections of flexible track are joined together, or joined to track switches, as the mainline is installed. Often a tie or two is clipped from the track ends in order to connect the pieces with rail joiners. Installation proceeds and eventually the completed track is tested with a few freight cars and a locomotive before it is deemed complete.

(more…)

Track installation basics, part 4

Monday, May 6th, 2013
Soldered electrical leads

Soldered electrical leads

Model railroading is the sum total of a variety of elements as an individual builds their dream layout. History, carpentry, engineering, painting, geology, architecture, electronics and electrical, and other components all combine for the final presentation. Each of these components may have additional aspects. As an example, electrical can consist of work with switches, relays, wire, and soldering.

(more…)