Archive for June, 2014

The first op session for the Wheeling Freight Terminal

Thursday, June 26th, 2014
The quiet before the storm of the first op session.

The quiet before the storm of the first op session.

My B&O Wheeling Freight Terminal layout has reached the point where I can hold an operating session. All of the track switch controls have been installed and adjusted to proper working order and a few track gauge issues have been corrected. It was time to make the leap of faith. My friend Mike committed to the initial shake down session so I was now locked in and needed to prep. This will be the first op session on a layout in my home since the summer of 2001. Where have the years gone?

(more…)