Setting up again – part 3

I’ve been working through a few Wheeling Freight Terminal track issues. One of the rails zippered out of the tieplates and spikes during the move or set up. You can kind of see it in the image above. That obviously needed to be fixed before anything rolls across the rails.

Continue reading “Setting up again – part 3”

Setting up again – part 2

With all the layout sections back on their legs and bolted together, it was time to connect the wiring. Two wires connect one section to another via a Euro-style nylon barrier strip. The lead photo shows how wires from an adjacent section are about to be connected to the barrier strip.

Continue reading “Setting up again – part 2”