Setting up again – part 2

With all the layout sections back on their legs and bolted together, it was time to connect the wiring. Two wires connect one section to another via a Euro-style nylon barrier strip. The lead photo shows how wires from an adjacent section are about to be connected to the barrier strip.

Continue reading “Setting up again – part 2”

Setting up again

I found the bolts! This was an important step for the HO scale Wheeling Freight Terminal layout. A couple sections use legs that are attached with bolts, washers, and nuts. All the section joints are bolted together. The proper hardware is an important component to set up the layout again.

Continue reading “Setting up again”

RPM events

As February slips away and the countdown to spring begins, it’s time to check out the Railroad Prototype Modeler (RPM) calendar for several March and April events. I’ve been a fan of these events for many years as I enjoy the presentations, display models, and seeing friends. I return home all charged up for the next project.

Continue reading “RPM events”