It’s been awhile since the last layout update. I’ve had several inquiries so I snapped a few new photos for this post.
Continue reading “Layout update”Tag: layout progress
Setting up again – part 3
I’ve been working through a few Wheeling Freight Terminal track issues. One of the rails zippered out of the tieplates and spikes during the move or set up. You can kind of see it in the image above. That obviously needed to be fixed before anything rolls across the rails.
Continue reading “Setting up again – part 3”Unboxing
With the Wheeling Freight Terminal layout standing and wired up, it’s time to unbox the freight car fleet. Nearly all of my kit-built freight cars have been stored away in Plano boxes like the one in the lead image.
Continue reading “Unboxing”Setting up again – part 2
With all the layout sections back on their legs and bolted together, it was time to connect the wiring. Two wires connect one section to another via a Euro-style nylon barrier strip. The lead photo shows how wires from an adjacent section are about to be connected to the barrier strip.
Continue reading “Setting up again – part 2”Basement progress
As we settle into our new home and undertake a few upgrades, I’ve been able to push progress on the hobby space. I recently built a frame for my workbench. As seen in the opening image, it is doubling as a computer work station area at the moment.
Continue reading “Basement progress”