Another year

A switcher works a string of cars at the freight house.
A switcher works a string of cars at the freight house.

New Year’s Eve is a time when many people assess the last twelve months and look ahead to the next year. Goals are set and promises are often made. Let’s take a look around the blog and the hobby room to see what has happened in 2014.

I like a year end reviewing as the number of projects and activities often surprises me. While I did not make as many blog posts as in 2013, I kept pretty busy with my layout and Mike’s layout in Las Cruces. I attended at least one operating session a month and I finally hosted a few sessions on the B&O Wheeling Freight Terminal. These become more satisfying each time and are a major reason why other projects keep moving along.

I’ve also been attending the monthly meetings of our local NMRA division, the Roadrunner Division. It’s been fun to interact with the other members and share tips and techniques. I’ve brought back at least one new idea from each of the meetings. I also traveled back to Pennsylvania last spring for the Valley Forge Railroad Prototype Modelers meet. It was great to see a bunch of old friends, take in presentation details, and operate on a couple of the layouts open for the event.

I won’t offer up my plans for 2015, but I do have three major projects and goals that I hope to achieve. Details will be shared here, of course. I also look forward to attending the RPM East event near Pittsburgh in late March, as well as the June NMRA Rocky Mountain Region convention in suburban Denver, CO. I’m most certain there will be more operating session details shared here, as well as freight car kit builds, and weathering factory output.

I hope you have set a few goals for the New Year. Railroad modeling becomes more enjoyable as we meet new challenges.

Thanks for stopping by. Your questions and comments can be posted below. Please follow the instructions so your comment comes through. All comments are reviewed and approved before they appear.

The first op session for the Wheeling Freight Terminal

The quiet before the storm of the first op session.
The quiet before the storm of the first op session.

My B&O Wheeling Freight Terminal layout has reached the point where I can hold an operating session. All of the track switch controls have been installed and adjusted to proper working order and a few track gauge issues have been corrected. It was time to make the leap of faith. My friend Mike committed to the initial shake down session so I was now locked in and needed to prep. This will be the first op session on a layout in my home since the summer of 2001. Where have the years gone?

Continue reading “The first op session for the Wheeling Freight Terminal”

Late May layout update!

Completed yard tracks.
Completed yard tracks.

It’s been a while since the last layout update. If you have been following along, you know the layout wiring is complete. All of the track has been painted and the fascia has been installed. The Wheeling Freight Terminal is looking pretty good.

 

Continue reading “Late May layout update!”

One step inspires more progress

A view of the wiring tasks.
A view of the wiring tasks.

I worked on the layout over this past weekend and completed the electrical wiring on the yard throat module. While surveying the work, I realized I had not made much progress in the last 4.5 months. Of course, I do consider wiring to be sheer drudgery, yet it is a necessary evil to complete in order to make the trains go. I guess I’ve just been avoiding this work as the fun factor is quite low. It’s a basic human trait to avoid the stuff we don’t like to do.

A terminal strip is used for multiple connections.
A terminal strip is used for multiple connections.

Over just a few days, I’ve completed the following tasks on the yard throat module.

  • installed feeder wires on four tracks
  • spray painted the rail and ties
  • installed leads on seven SPDT momentary contact switches to control the frog polarity
  • attached all feeder wires to the appropriate buss wires
One view of the module surface.
One view of the module surface.

Successful completion of this work inspires and motivates me to keep moving forward. This is how my hobby ebbs and flows. I’ve rarely achieved a straight line progression in task completion. There are often bursts of activity followed by a quiet stretch. At this point, only one module remains to be electrically completed. I hope to wrap that one up in the next week as the B&O Wheeling Freight Terminal project moves closer to operation.

Everything looks a little better with a few freight cars.
Everything looks a little better with a few freight cars.

I welcome your comments. All comments are reviewed and approved before they appear here.

Benchwork section progress

Most recently built.

As mentioned, I’ve been building benchwork sections for the new layout. I’ve employed a uniform design for five sections and all are nearly complete. The image above shows the last two sections. These sections follow some of my layout project rules.

  • Keep it Simple
  • Reuse what is on hand
  • Build to be flexible for future projects

Continue reading “Benchwork section progress”