More Layout Adjustments

After working through the layout adjustments noted in the last blog post, additional issues have turned up. There are two locations on the Wheeling Freight Terminal where curved track crosses layout sections at an angle, as can be seen in the lead image. One or two tracks have been problematic but now the problems have increased after setting up the layout in a new home. Click on any image here to review  larger size.

Continue reading “More Layout Adjustments”

Layout Adjustments

The Wheeling Freight Terminal layout sections have assembled easily in the new space but there are a few adjustments to make in order to operate again. One adjustment was noted in the last blog post where four inches of a section needed to be removed in order for all to fit into the space. A survey of the layout has revealed the need for additional adjustments. Thankfully, no other sections need to be shortened.

Continue reading “Layout Adjustments”

Fitting the Layout

I almost titled this post as Moving Along – part 3, but we are beyond the moving phase. The Wheeling Freight Terminal layout sections got onto their legs this week! Well, not all of them are on their legs as a problem was discovered. The layout is slightly longer than the space. I will admit, I did not measure the room before we committed to the house rental but I also did not know the actual long dimension of the layout. Yup, I did a job on this one. Click on any image here to view a larger size.

Continue reading “Fitting the Layout”

September 2016 Operating Session

20160922_fullcrew

We were back to a full crew for the latest Wheeling Freight Terminal operating session. Mike and Robbie were the freight house crew. They are on the left in the lead image. Erik and Tom worked the team yard. This was Tom’s first time operating here and he did very well for a first timer.

Continue reading “September 2016 Operating Session”

August 2016 Op Session

201608_op1

The Wheeling Freight Terminal has monthly operating sessions. A message is sent to several interested modelers and operators in the area about a week beforehand. I’ve typically been operating on the fourth Thursday of the month and a layout in nearby Las Cruces hosts a session on the second Thursday. August was busy for the usual crew and only Robbie was able to attend the recent session.

Continue reading “August 2016 Op Session”